cGMP Grade D Cleanroom
Construction Year : 2013
The facility is designed at Grade D Cleanroom. The total built up area of the facility is 760m². The facility was design and built according to cGMP guideline to fulfil the approval of National Pharmaceutical Control Bureau.
cGMP Grade D Cleanroom
Construction Year : 2013
The facility is designed at Grade D Cleanroom. The total built up area of the facility is 927m². The facility was design and built according to cGMP guideline to fulfil the approval of National Pharmaceutical Control Bureau.
Insectary and Arthropod Containment Laboratory Level 2 (ACL2)
Construction Year : 2013
The facility comprises of ACL1 and ACL2. The total built up area of the facility is 75m². The facility was design and built according to Arthropod Containment Level.
Pathology Laboratory
Construction Year : 2012/2013
The total built up area of each facility is 620 m². The facility was design and built according to Australian & New Zealand Standard AS/NZS 2243.3.2009.
Microbiology Laboratory
Construction Year : 2010/2012
There are 2 identical facilities located in differently in North region and South region. The total built up area of each facility is 160m². The facility was design and built according to BSL Standard and Biocontainment advice.
ABSL II Animal Research Facility
Construction Year : 2011
The total built up area of facility is 1000m² for 4 storey building. The facility was built according Association of Assessment of Laboratory Animal Care ( AAALAC ) and it is certified as Animal Bio Safety Laboratory Class II ( ABSL II ).
Human Tissue Processing Facility
Construction Year : 2011
This facility comprises of CGMP B, C & D facility. The total built up area of facility is 300m². The facility was built with the collaboration of consultation according to Australia Standard and GMP Standard.
Animal Research Facility
Construction Year : 2010/2011
The total built up area of facility is 1000m². The facility was built according to Association of Assessment and Accreditation of Laboratory Animal Care ( AAALAC ) and Standard of Good Laboratory Practice (GLP).
Stem Cell Transplant Laboratory
Construction Year : 2010
The total built up area of facility is 80m². This facility was designed at Class 10,000 and comply to NEBB Testing Criteria.
BSL III Tuberculosis Diagnostic Laboratory
Construction Year : 2009
The facility was built in Microbiology Laboratory and comprises of BSL II and BSL III. The total built up area of facility is 53m². The facility was built with the collaboration of consultation and accredited to Australian & New Zealand Standard AS/NZS 2243.3.2009 . It is historically recognised as the 1st BSL III built complete with Assurance and Accreditation in Malaysia.